GridFlo › Current transformer GTP check

Current transformer GTP check against the tender specification

By the GridFlo team at Hyzync · Updated

To check a current transformer GTP, compare each value the vendor guarantees with the requirement in the tender specification: ratings, insulation levels, short-circuit performance and auxiliary details. GridFlo does this automatically for 17 current transformer parameters and returns a deviation sheet with the clause and page for each finding.

What GridFlo checks in a current transformer GTP

These 17 parameters are compared with your specification. Anything else in the vendor's sheet is left for the engineer.

ParameterUnit
Rated voltage (Um)kV
Rated frequencyHz
Minimum creepage distancemm/kV
Lightning impulse withstand voltagekVp
Power frequency withstand voltage (1 min)kV
Short-time withstand currentkA
Short-time current durations
Applicable standard–
Rated primary currentA
Rated secondary currentA
Number of coresnos
Accuracy class–
Knee-point voltageV
Rated burdenVA
Instrument security factorpu
Accuracy limit factorpu
Partial discharge levelpC

Deviations vendors commonly make

How the check works

  1. Upload the tender specification as a PDF. Several documents can be combined, for example an equipment specification and a general ratings specification.
  2. Upload the vendor's GTP in Excel or CSV, in whatever layout the vendor used.
  3. Choose "Current transformer" and the system voltage.
  4. Review the result. Each value is marked complies, deviation, not furnished or to verify, with the sentence from the specification beside it. Download the deviation sheet and the vendor comments.

AI is used only to read the specification. The pass or fail decision is made by fixed engineering rules that convert units and know which direction is safe. When the specification is unclear or contradicts itself, the item is flagged for an engineer and never passed silently.

Frequently asked questions

Can GridFlo check a current transformer GTP against a scanned specification?

Yes. Scanned pages are read as images. Values read from scans are marked for the engineer to confirm.

Which current transformer standards does it work with?

GridFlo checks against whatever your tender specification requires, so it works with specifications based on IEC 61869-2 / IS 16227 and utility-specific requirements. It does not need the text of the standard.

How long does a check take?

One to three minutes for a new specification. Further vendor GTPs against the same specification are checked in seconds.

Is it accurate?

On 13 test cases from public Indian and UK utility specifications, GridFlo read 97 of 97 specified values correctly and invented none. It is a first pass for an engineer, who makes the final decision.

Check your next GTP in minutes

5 free checks. No card needed. Try it on our sample tender in one click.

Related