GTP review checklist: 12 points engineers miss

By the GridFlo team at Hyzync · Updated

When reviewing a vendor GTP, check that every specified parameter has a guaranteed value, that units match after conversion, that each CT core is checked separately, and that tolerances and 'higher is better' ratings are judged correctly. The 12 points below cover the mistakes that slip through most often.

  1. Right equipment, right voltage. Specifications often cover 11 kV and 33 kV, or several voltages, in one table. Read the correct column.
  2. Every parameter answered. A blank cell is a deviation until the vendor fills it.
  3. "As per IEC" is not a value. Ask for the number or the class.
  4. Units converted. Cycles to ms, kV rms to kV peak, mm to mm/kV, kA rms to kA peak.
  5. Direction understood. Higher withstand is fine. Longer break time, higher losses or higher residual voltage are not.
  6. Duration with the current. 25 kA for 1 s is not 25 kA for 3 s.
  7. CT cores one by one. Ratio, class, burden, knee-point voltage and ISF or ALF for each core, in the specification's order.
  8. Tolerances applied. Transformer impedance has a tolerance band; a value inside it complies.
  9. Auxiliary supply matches the station. Control, motor and heater voltages.
  10. Site conditions. Creepage for the pollution level, altitude, ambient temperature, seismic zone.
  11. Conflicts in the specification flagged. If two clauses disagree, raise a query; don't choose silently.
  12. Reference on every comment. Clause and page, so the vendor cannot dispute it.

GridFlo applies all twelve automatically and shows the sentence in the specification behind every finding, so the engineer's time goes to decisions, not searching.

Frequently asked questions

What is the most common GTP mistake?

Missing or vague answers: blank cells and 'as per IEC' in place of a guaranteed value. Next are ratings one step below the specification and unit changes that hide a shortfall.

How many review rounds does a GTP usually need?

Two to three rounds are typical before approval. Clear, clause-referenced comments in the first round reduce this.