Power transformer GTP check against the tender specification
To check a power transformer GTP, compare each value the vendor guarantees with the requirement in the tender specification: ratings, insulation levels, short-circuit performance and auxiliary details. GridFlo does this automatically for 28 power transformer parameters and returns a deviation sheet with the clause and page for each finding.
- Also covers: distribution transformer, ICT, 33/11 kV, 132/33 kV, 220/132 kV
- Typical standard: IEC 60076 / IS 2026
- Text and scanned PDF specifications
What GridFlo checks in a power transformer GTP
These 28 parameters are compared with your specification. Anything else in the vendor's sheet is left for the engineer.
| Parameter | Unit |
|---|---|
| Rated frequency | Hz |
| Minimum creepage distance | mm/kV |
| Applicable standard | – |
| Rated power | MVA |
| HV rated (no-load) voltage | kV |
| LV rated (no-load) voltage | kV |
| Tertiary rated voltage | kV |
| Vector group | – |
| Type of cooling | – |
| Percentage impedance (principal tap) | % |
| No-load loss | kW |
| Load loss at rated current | kW |
| Auxiliary loss | kW |
| Tap range | – |
| Number of tap steps | nos |
| Tap changer type | – |
| Top oil temperature rise | K |
| Average winding temperature rise | K |
| Noise level | dB |
| Lightning impulse withstand - HV | kVp |
| Lightning impulse withstand - LV | kVp |
| Lightning impulse withstand - neutral | kVp |
| Switching impulse withstand - HV | kVp |
| Power frequency withstand - HV | kV |
| Power frequency withstand - LV | kV |
| Maximum flux density | T |
| Maximum current density | A/mm2 |
| Short-circuit withstand duration | s |
Deviations vendors commonly make
- Percentage impedance outside the permitted tolerance band.
- No-load and load losses higher than the guaranteed maximum.
- Tap range or number of steps different from the specification.
- Vector group or type of cooling that doesn't match.
- Temperature rise of oil or winding above the limit.
- Flux density or current density above the specified maximum.
How the check works
- Upload the tender specification as a PDF. Several documents can be combined, for example an equipment specification and a general ratings specification.
- Upload the vendor's GTP in Excel or CSV, in whatever layout the vendor used.
- Choose "Power transformer" and the system voltage.
- Review the result. Each value is marked complies, deviation, not furnished or to verify, with the sentence from the specification beside it. Download the deviation sheet and the vendor comments.
AI is used only to read the specification. The pass or fail decision is made by fixed engineering rules that convert units and know which direction is safe. When the specification is unclear or contradicts itself, the item is flagged for an engineer and never passed silently.
Frequently asked questions
Can GridFlo check a power transformer GTP against a scanned specification?
Yes. Scanned pages are read as images. Values read from scans are marked for the engineer to confirm.
Which power transformer standards does it work with?
GridFlo checks against whatever your tender specification requires, so it works with specifications based on IEC 60076 / IS 2026 and utility-specific requirements. It does not need the text of the standard.
How long does a check take?
One to three minutes for a new specification. Further vendor GTPs against the same specification are checked in seconds.
Is it accurate?
On 13 test cases from public Indian and UK utility specifications, GridFlo read 97 of 97 specified values correctly and invented none. It is a first pass for an engineer, who makes the final decision.