GridFlo › Isolator / disconnector GTP check
Isolator / disconnector GTP check against the tender specification
To check a isolator GTP, compare each value the vendor guarantees with the requirement in the tender specification: ratings, insulation levels, short-circuit performance and auxiliary details. GridFlo does this automatically for 16 isolator parameters and returns a deviation sheet with the clause and page for each finding.
- Also covers: disconnector, earth switch, centre break, double break, pantograph
- Typical standard: IEC 62271-102 / IS 9921
- Text and scanned PDF specifications
What GridFlo checks in a isolator GTP
These 16 parameters are compared with your specification. Anything else in the vendor's sheet is left for the engineer.
| Parameter | Unit |
|---|---|
| Rated voltage (Um) | kV |
| Rated frequency | Hz |
| Minimum creepage distance | mm/kV |
| Lightning impulse withstand voltage | kVp |
| Power frequency withstand voltage (1 min) | kV |
| Short-time withstand current | kA |
| Short-time current duration | s |
| Applicable standard | – |
| Rated normal current | A |
| Lightning impulse withstand across isolating distance | kVp |
| Power frequency withstand across isolating distance | kV |
| Type of disconnector | – |
| Operating mechanism | – |
| Earth switch | – |
| Auxiliary / control DC voltage | V |
| Mechanical endurance class | – |
Deviations vendors commonly make
- Rated normal current or short-time withstand current below the specified value.
- Withstand voltages across the isolating distance left blank.
- Type of disconnector different from the layout (centre break offered against double break).
- Motor or control voltage that doesn't match the station's DC supply.
- Earth switch not included or not rated for the full short-time current.
- Mechanical endurance class not stated.
How the check works
- Upload the tender specification as a PDF. Several documents can be combined, for example an equipment specification and a general ratings specification.
- Upload the vendor's GTP in Excel or CSV, in whatever layout the vendor used.
- Choose "Isolator / disconnector" and the system voltage.
- Review the result. Each value is marked complies, deviation, not furnished or to verify, with the sentence from the specification beside it. Download the deviation sheet and the vendor comments.
AI is used only to read the specification. The pass or fail decision is made by fixed engineering rules that convert units and know which direction is safe. When the specification is unclear or contradicts itself, the item is flagged for an engineer and never passed silently.
Frequently asked questions
Can GridFlo check a isolator GTP against a scanned specification?
Yes. Scanned pages are read as images. Values read from scans are marked for the engineer to confirm.
Which isolator standards does it work with?
GridFlo checks against whatever your tender specification requires, so it works with specifications based on IEC 62271-102 / IS 9921 and utility-specific requirements. It does not need the text of the standard.
How long does a check take?
One to three minutes for a new specification. Further vendor GTPs against the same specification are checked in seconds.
Is it accurate?
On 13 test cases from public Indian and UK utility specifications, GridFlo read 97 of 97 specified values correctly and invented none. It is a first pass for an engineer, who makes the final decision.
Check your next GTP in minutes
5 free checks. No card needed. Try it on our sample tender in one click.