GridFlo › Isolator / disconnector GTP check

Isolator / disconnector GTP check against the tender specification

By the GridFlo team at Hyzync · Updated

To check a isolator GTP, compare each value the vendor guarantees with the requirement in the tender specification: ratings, insulation levels, short-circuit performance and auxiliary details. GridFlo does this automatically for 16 isolator parameters and returns a deviation sheet with the clause and page for each finding.

What GridFlo checks in a isolator GTP

These 16 parameters are compared with your specification. Anything else in the vendor's sheet is left for the engineer.

ParameterUnit
Rated voltage (Um)kV
Rated frequencyHz
Minimum creepage distancemm/kV
Lightning impulse withstand voltagekVp
Power frequency withstand voltage (1 min)kV
Short-time withstand currentkA
Short-time current durations
Applicable standard–
Rated normal currentA
Lightning impulse withstand across isolating distancekVp
Power frequency withstand across isolating distancekV
Type of disconnector–
Operating mechanism–
Earth switch–
Auxiliary / control DC voltageV
Mechanical endurance class–

Deviations vendors commonly make

How the check works

  1. Upload the tender specification as a PDF. Several documents can be combined, for example an equipment specification and a general ratings specification.
  2. Upload the vendor's GTP in Excel or CSV, in whatever layout the vendor used.
  3. Choose "Isolator / disconnector" and the system voltage.
  4. Review the result. Each value is marked complies, deviation, not furnished or to verify, with the sentence from the specification beside it. Download the deviation sheet and the vendor comments.

AI is used only to read the specification. The pass or fail decision is made by fixed engineering rules that convert units and know which direction is safe. When the specification is unclear or contradicts itself, the item is flagged for an engineer and never passed silently.

Frequently asked questions

Can GridFlo check a isolator GTP against a scanned specification?

Yes. Scanned pages are read as images. Values read from scans are marked for the engineer to confirm.

Which isolator standards does it work with?

GridFlo checks against whatever your tender specification requires, so it works with specifications based on IEC 62271-102 / IS 9921 and utility-specific requirements. It does not need the text of the standard.

How long does a check take?

One to three minutes for a new specification. Further vendor GTPs against the same specification are checked in seconds.

Is it accurate?

On 13 test cases from public Indian and UK utility specifications, GridFlo read 97 of 97 specified values correctly and invented none. It is a first pass for an engineer, who makes the final decision.

Check your next GTP in minutes

5 free checks. No card needed. Try it on our sample tender in one click.

Related