GridFlo › Voltage transformer GTP check
Voltage transformer GTP check against the tender specification
To check a voltage transformer GTP, compare each value the vendor guarantees with the requirement in the tender specification: ratings, insulation levels, short-circuit performance and auxiliary details. GridFlo does this automatically for 15 voltage transformer parameters and returns a deviation sheet with the clause and page for each finding.
- Also covers: PT, potential transformer, CVT, IVT, capacitor voltage transformer
- Typical standard: IEC 61869-3 / IEC 61869-5 / IS 16227
- Text and scanned PDF specifications
What GridFlo checks in a voltage transformer GTP
These 15 parameters are compared with your specification. Anything else in the vendor's sheet is left for the engineer.
| Parameter | Unit |
|---|---|
| Rated voltage (Um) | kV |
| Rated frequency | Hz |
| Minimum creepage distance | mm/kV |
| Lightning impulse withstand voltage | kVp |
| Power frequency withstand voltage (1 min) | kV |
| Applicable standard | – |
| Rated primary voltage | kV |
| Rated secondary voltage | V |
| Voltage ratio | – |
| Number of secondary windings | nos |
| Accuracy class | – |
| Rated burden | VA |
| Rated voltage factor | – |
| Total capacitance (CVT) | pF |
| Partial discharge level | pC |
Deviations vendors commonly make
- Accuracy class of a winding that doesn't match (0.5 offered against 0.2 for metering).
- Rated burden lower than specified.
- Voltage factor of 1.2 continuous / 1.5 for 30 s offered where 1.9 for 8 hours is needed.
- Fewer secondary windings than specified.
- Total capacitance of a CVT below the value needed for carrier communication.
- Secondary voltage of 110 V offered against 110/√3 V.
How the check works
- Upload the tender specification as a PDF. Several documents can be combined, for example an equipment specification and a general ratings specification.
- Upload the vendor's GTP in Excel or CSV, in whatever layout the vendor used.
- Choose "Voltage transformer" and the system voltage.
- Review the result. Each value is marked complies, deviation, not furnished or to verify, with the sentence from the specification beside it. Download the deviation sheet and the vendor comments.
AI is used only to read the specification. The pass or fail decision is made by fixed engineering rules that convert units and know which direction is safe. When the specification is unclear or contradicts itself, the item is flagged for an engineer and never passed silently.
Frequently asked questions
Can GridFlo check a voltage transformer GTP against a scanned specification?
Yes. Scanned pages are read as images. Values read from scans are marked for the engineer to confirm.
Which voltage transformer standards does it work with?
GridFlo checks against whatever your tender specification requires, so it works with specifications based on IEC 61869-3 / IEC 61869-5 / IS 16227 and utility-specific requirements. It does not need the text of the standard.
How long does a check take?
One to three minutes for a new specification. Further vendor GTPs against the same specification are checked in seconds.
Is it accurate?
On 13 test cases from public Indian and UK utility specifications, GridFlo read 97 of 97 specified values correctly and invented none. It is a first pass for an engineer, who makes the final decision.