GTP checker for substation tenders

Check every vendor GTP
against the spec. In minutes.

Upload the tender specification and the vendor's filled GTP (Guaranteed Technical Particulars). GridFlo marks every deviation and every value not furnished, each with its clause and page, and drafts the comment resolution sheet for the vendor.

5 free checks · no card needed · try it on our sample files in one click

gridflo.hyzync.com
GridFlo HomeAll checksTeamPlans & usage
Revise and resubmit3 deviations and 2 values not furnished. CRS drafted.
Deviation3
Not furnished2
To verify0
Complies9
ResultWhat's checkedSpec requiresVendor offersWhere in spec
DeviationShort-time current duration3 s1 sPage 78
DeviationTotal break time≤ 3 cycles (60 ms)65 msPage 79
DeviationTrip / close coil voltage48 V DC110 VPage 79
Not furnishedMechanical endurance classper IEC 62271-100"as per IEC"Page 77
CompliesLightning impulse withstand170 kVp170 kVpPage 78
The problem

GTP review is slow, manual and risky.

Every substation package brings hundreds of vendor documents, and each GTP goes through two or three review rounds. Engineers compare it line by line with a specification that runs to hundreds of pages. A deviation missed at this stage is found at factory inspection or at site, where it costs far more to fix.

One GTP reviewBy handWith GridFlo
Find the requirementsSearch a 100–500 page specificationRead for you, with clause and page
Compare each valueLine by line, converting units yourselfEvery value compared, units converted
Write the commentsTyped into the CRS one by oneCRS drafted with clause references
Vendor resubmitsCheck the whole sheet againClosed, still open and new comments listed
Your timeAbout half a day per documentMinutes, spent on decisions
How it works

Three steps. Two minutes.

No setup, no templates. Use the documents you already have.

1

Upload the spec

Drop in the tender specification PDF. Scanned pages work too.

2

Upload the vendor's GTP

Their filled Excel sheet, in any layout, including separate columns per CT core.

3

Get the deviation sheet

Every deviation and value not furnished, linked to its clause. The comment resolution sheet is ready to send.

Where it fits

The two moments you check a GTP.

Before award

Technical bid evaluation

Run every bidder's GTP against the specification and see them side by side.

  • Catches deviations the bidder did not declare. A bid with no deviation sheet is normally taken as fully compliant, so an undeclared deviation becomes your problem after award.
  • Builds the vendor comparison for your TBE: parameters in rows, bidders in columns.
  • Gives each bidder a clause-referenced list of technical queries.
After award

GTP approval

The vendor submits the GTP for approval. You return it with comments until it complies.

  • Marks each value: complies, deviation, not furnished, or to verify.
  • Drafts the comment resolution sheet (CRS) with a column for the vendor's reply.
  • When the vendor resubmits, shows which comments are closed, which are still open and anything new. Deviations you accepted stay accepted.
What you get back

Three documents you already use.

Deviation sheet (Excel)

Every parameter with the specified value, the offered value, compliance status, clause, page and the sentence from the specification.

Comment resolution sheet (Excel)

Numbered comments for the vendor: specified, offered, your comment, and blank columns for their reply and status.

Vendor comparison

All vendors for one equipment against the specification, in one table, for the technical bid evaluation.

Who gains what

Useful to the whole project team.

Design engineer

Starts from a finished first pass with the clause beside every finding. Time goes to judging deviations, not hunting through the specification.

Lead engineer

Every reviewer applies the same rules. Accepted deviations are recorded with a name and a reason, ready for audits and handovers.

Project manager

Comments go back to vendors the same day, so approval rounds stop holding up manufacturing clearance.

Built for engineers

Fast, and you can check every answer.

AI reads the documents. Fixed engineering rules decide what passes. You confirm.

Every value traced

Each requirement shows its page, clause and the exact sentence, checked automatically against the PDF.

Never guesses "complies"

When anything is uncertain, such as unclear text or two clauses that disagree, it is marked "to verify", never passed.

Speaks engineering units

kV vs kVp, cycles vs ms, mm vs mm/kV, kA peak. Higher-is-safer ratings are handled correctly.

CRS drafted for you

Numbered comments with clause references, as an Excel comment resolution sheet or as text for your email.

One workspace per team

Invite colleagues. Everyone sees every check, who ran it, and the results.

Your documents stay yours

Visible only to your workspace and never used to train AI. Delete a check any time.

Circuit breakersCurrent transformers (per core)Surge arresters Power transformersIsolators & earth switchesVT / CVT / IVT
Tested on real tenders

Accurate where it matters.

Measured on 13 test cases from public Indian (OPTCL, MSEDCL) and UK (National Grid) specifications.

97/97specification values read correctly
100%of planted vendor errors caught in test GTPs
0values invented on a blank GTP form
1–3 minper new specification; repeats are instant
Pricing

Start free. Upgrade when it pays for itself.

One avoided rework pays for a year. Prices in INR, excluding GST.

FAQ

Questions, answered.

What is a GTP in a substation tender?

GTP stands for Guaranteed Technical Particulars. It is the schedule a vendor fills and signs to guarantee the technical values of the equipment they offer, such as rated voltage, short-circuit current and accuracy class. The buyer checks it against the tender specification before approving the vendor.

What is a deviation sheet?

A deviation sheet lists every point where the vendor's offer differs from the specification: the parameter, the required value with its clause, the offered value and the status. GridFlo produces it as an Excel file, along with a comment sheet to send to the vendor.

Which equipment can GridFlo check?

Circuit breakers, current transformers (each core separately), surge arresters, power transformers, isolators and disconnectors, and voltage transformers (VT, CVT, IVT), from 11 kV to 765 kV.

How long does a GTP check take?

One to three minutes for a new specification, against several hours by hand. Checking more vendors against the same specification takes seconds.

Who is GridFlo for?

EPC contractors, design consultancies and utilities that review vendor documents for substation projects, and want engineers to spend their time on decisions and not on line-by-line comparison.

What exactly is a GTP check?

Vendors send a filled "Guaranteed Technical Particulars" sheet stating what their equipment offers. GridFlo compares every value in it with the requirements in your tender specification and lists what doesn't comply, what's missing, and what needs a closer look.

Do I need to set anything up?

No. Upload the spec PDF and the vendor's Excel GTP, pick the equipment type, and run. You can try it on our sample files in one click after signing up.

Can I rely on the results?

GridFlo is a fast first pass for an engineer, not a replacement. AI only reads the documents; pass/fail is decided by fixed rules, and every finding links to the spec text so you can verify it in seconds. Anything uncertain is flagged for review instead of passed.

Which specifications work?

Any English text or scanned PDF, including specifications split across several documents. We've tested on Indian state utility specifications (OPTCL, MSEDCL) and UK National Grid technical specifications, all IEC-based.

How much does GridFlo cost?

The trial is free: 5 checks, no card needed. Paid plans are monthly and priced in INR; see the pricing section above. One avoided rework usually pays for a year.

Is our tender data safe?

Documents are visible only to your workspace and are not used to train AI models. You can delete any check and its files at any time. For utilities and large EPCs, we offer private deployment.

Your next GTP review could take two minutes.

Start free with 5 checks. No card needed.