GridFlo › Deviation Sheet for Vendor GTP Review

How to prepare a deviation sheet for a vendor GTP

By the GridFlo team at Hyzync · Updated

A deviation sheet lists every point where a vendor's offer differs from the tender specification. Each row names the parameter, the specified value with its clause and page, the value the vendor offered, and the status: complies, deviates, or not provided.

Columns of a good deviation sheet

ColumnWhat goes in it
ParameterThe item being checked, e.g. short-time current duration
Specification requiresThe required value and unit, e.g. 3 s
ReferenceClause and page of the specification, so anyone can verify it
Vendor offersThe value in the vendor's GTP, e.g. 1 s
StatusComplies, deviation, not furnished, or to verify
Comment / decisionWhat the vendor must do, or why the deviation is accepted

Example: 33 kV vacuum circuit breaker

ParameterSpecificationVendor offersStatus
Short-time current duration3 s (cl. 5.0)1 sDeviation
Total break time≤ 3 cycles = 60 ms (cl. 5.2)65 msDeviation
Control voltage48 V DC (cl. 5.2)110 VDeviation
Mechanical endurance classPer IEC 62271-100"as per IEC"Not furnished
Lightning impulse withstand170 kVp170 kVpComplies

Rules that avoid mistakes

Preparing it automatically

GridFlo prepares the deviation sheet from the two documents. Upload the tender specification PDF and the vendor's GTP in Excel; it reads the requirements, applies the rules above, links every row to the exact sentence in the specification, and exports the deviation sheet and a comment sheet in Excel. Engineers then accept, reject or annotate each row.

Frequently asked questions

What is the difference between a deviation sheet and a comment sheet?

A deviation sheet lists every difference between the offer and the specification. A comment sheet (or comment resolution sheet) is what you send to the vendor: only the points they must correct, with space for their reply.

Who prepares the deviation sheet?

Sometimes the vendor declares deviations in the bid. In practice the EPC contractor's or consultant's engineer prepares one by checking the GTP against the specification, because undeclared deviations are common.

How long does a deviation sheet take to prepare?

By hand, a few hours per document for a careful engineer. GridFlo produces a first-pass deviation sheet in one to three minutes, which the engineer then reviews.

Check your next GTP in minutes

5 free checks. No card needed. Try it on our sample tender in one click.

Related